Saturday, 25 October 2014

Work Timetable

This is my work schedule for this project. I have decided to dedicate most of the time to the main project but the last three weeks to the smaller tasks such as the article and poster this is because I do not want to waste too much time on making them and would rather have more time for the movie.

I decided to give myself a lot of time for both filming and editing as I do not have much experience with these and wish to have as much time as possible on these areas.

No comments:

Post a Comment