This is my work schedule for this project. I have decided to dedicate most of the time to the main project but the last three weeks to the smaller tasks such as the article and poster this is because I do not want to waste too much time on making them and would rather have more time for the movie.
I decided to give myself a lot of time for both filming and editing as I do not have much experience with these and wish to have as much time as possible on these areas.
No comments:
Post a Comment